In recent years, the energy transition and the modernisation of high-voltage electricity transmission networks have become strategic priorities for the country’s security and resilience. In this context, the undergrounding of cables is one of the solutions most favoured by the public and local authorities because it eliminates the visual impact, can often free up land currently occupied by pylons, and reduces the effect of electromagnetic fields. However, as the technicians and engineers at Terna – the national transmission grid manager– point out, undergrounding power lines is not a technical solution that you can indiscriminately apply to any geographical or topographical context.
The installation and management of underground cabling require a rigorous cost-benefit analysis and a complex geotechnical assessment. In rural areas or in geomorphologically fragile environments such as hillsides prone to landslides or mudslides, or near watercourses, traditional overhead lines ensure higher safety standards. A support structure positioned at a higher level is above any ground instability, whereas an underground cable could be severely impacted by landslides and the like, causing complex faults and potentially very long repair times.
There are also environmental and maintenance-related reasons why cable undergrounding may not be permitted: in protected natural areas, carrying out repairs to an underground fault by using excavators and heavy machinery would cause far greater damage to the ecosystem than having overhead cable supports. On the other hand, underground cabling becomes an essential and priority option in heavily urbanised and metropolitan areas, where building density makes it almost impossible to erect pylons and where demand for energy is constantly growing.
Operational standards and land management. High-voltage cables are typically laid at a depth of between 1.20 and 2.00 metres below road level. The first metre beneath the tarmac falls within the competence of the road owning body; a 20 cm buffer layer beneath this allows for the routing of various underground utilities – fibre-optic cables, telecommunications cables, gas pipes – without impacting on the high-voltage infrastructure.
Horizontal Directional Drilling (HDD) is often used when crossing watercourses, busy highways or sensitive areas; this technique (known in the trade as “No Dig”) does not involve open-cut excavation and significantly reduces the impact on the surface and on traffic flow.
Under normal circumstances, urban work sites are organised as a series of small, progressively moving phases. This system allows traffic to continue to flow via alternating one-way systems or diversions, supported by temporary signage and notices on information boards. Operations are carried out in close coordination with local authorities and the municipal police.